|
Condos in Pattaya - Analytics
|
01 June 2011 Avatara Condo news Building A:
• ° Kitchen installation almost ready
• ° A/C installations ongoing
•
• ° Rectification works ongoing
• ° Lift to be tested and certified
• ° Filling swimming pool
• ° Rear road work to start
| |
| |
| |